New trains added to Guangzhou metro line 3 & 5
2012-March-19 Source: Newsgd.com
Text Size: A A A | Print | Share by E-mail:

According to Guangzhou Metro Company, new trains will be added to metro line 3 and 5 from April, aiming to alleviate the traffic. One train will be added every one and a half month to line 3 and one to two trains will be added every month to line 5. By the end of this year, the interval time of Tianhe Coach Terminal-Panyu Square metro line and metro line 5 during the rush hour will be in 3 minutes, and Airport South-Tiyixi Road metro line will be within 4 minutes.

Huge traffic volume at Guanzghou metro line 3.

Guangzhou will launch a new round of metro costruction, and by the end of 2016, a batch of new metro lines will be built, revealed Guangzhou Mayor Chen Jianhua during his inspection at Guangzhou Railway Group Corp. Currently, metro line 6, phase II of Guangzhou-Foshan metro, and metro line 7 & 9, covering a total area of 92.4 KM, are under construction.

(By Mo Qun)

Editor: Miranda
Related News
This site contains material from other media for content enrichment purpose only. The Southcn.com website do not endorse such content and do not bear the joint responsibility of their copyright infringement. The views expressed in written material posted to the bulletin boards of Southcn.com are those of the authors and/or publishers. The Southcn.com website does not endorse information products posted by organizations and individuals here. The originators of these information products are solely responsible for their content. For copyright infringement issues, you shall contact Southcn.com within thirty (30) days. Email: falv@southcn.com
Info for Non-Residents