Shenzhen-Zhongshan Cross-sea Link makes progress on the tube coupling

2021-Aug-31       Source: Newsgd.com

The E32 tube coupling of the #Shenzhen-#Zhongshan cross-sea link project's undersea immersed tube tunnel, the first one in the east end, was successfully installed on August 30th. It is estimated that

The E32 tube coupling of the Shenzhen-Zhongshan cross-sea link project's undersea immersed tube tunnel, the first one in the east end, was successfully installed on August 30th. It is estimated that in 2023 the whole tunnel, which is made up of 32 tubes, will be finished under the Lingding Channel.

The 24-kilometer link connecting the cities of Shenzhen and Zhongshan will play an essential role in the development of the Guangdong-Hong Kong-Macao Greater Bay Area. The link includes the 6.8-kilometer underwater tunnel and two artificial islands. The tunnel is the world's first undersea immersed tube tunnel with four lanes in each direction. The Shenzhen-Zhongshan cross-sea link will open to traffic in 2024. It will cut travel time between the two cities from two hours to 30 minutes.

The E32 tube coupling of the Shenzhen-Zhongshan cross-sea link project's undersea immersed tube tunnel,the first one in the east end , was successfully installed on August 30th. (Provided to Newsgd.com)

The E32 tube coupling of the Shenzhen-Zhongshan cross-sea link project's undersea immersed tube tunnel,the first one in the east end , was successfully installed on August 30th. (Provided to Newsgd.com)

The E32 tube coupling of the Shenzhen-Zhongshan cross-sea link project's undersea immersed tube tunnel,the first one in the east end , was successfully installed on August 30th. (Provided to Newsgd.com)

The E32 tube coupling of the Shenzhen-Zhongshan cross-sea link project's undersea immersed tube tunnel,the first one in the east end , was successfully installed on August 30th. (Provided to Newsgd.com)

The E32 tube coupling of the Shenzhen-Zhongshan cross-sea link project's undersea immersed tube tunnel,the first one in the east end , was successfully installed on August 30th. (Provided to Newsgd.com)

The E32 tube coupling of the Shenzhen-Zhongshan cross-sea link project's undersea immersed tube tunnel,the first one in the east end , was successfully installed on August 30th. (Provided to Newsgd.com)

 

Reporter:Nan

Editor:Olivia, Jerry

Editor: Alice

Scan to share on WeChat

Scan to follow us on WeChat

Related News

Home|About us|Contact us|Southcn.com

WWW.NEWSGD.COM. All rights reserved.

WWW.NEWSGD.COM. All rights reserved.|Registered number 020074| 粤公网安备 44010402000511号|ICP备案号粤B-20050235